Trial results

Australia, Lake Margaret

This document shows the result of two trials using the draft Hydropower Sustainability Assessment Protocol (August 2009): a 3.2MW project, assessed using Section II and a 8.4 MW project, assessed using Section III.

 Australia, Lake Margaret (pdf 127kb)

Brazil, São Salvador

243MW project, assessed using Section III of the draft Hydropower Sustainability Assessment Protocol (August 2009)

 Brazil, São Salvador (pdf 3.6mb)

Brazil, Sinop

460MW project, assessed using Sections I and II of the draft Hydropower Sustainability Assessment Protocol (August 2009)

 Brazil, Sinop (pdf 92kb)

Brazil, Xanxere

21MW project, assessed using Section I of the draft Hydropower Sustainability Assessment Protocol (August 2009)

 Brazil, Xanxere (pdf 69kb)

Canada, Wuskwatim and Keeyask

This document shows the result of two trials using the draft Hydropower Sustainability Assessment Protocol (August 2009): a 200MW project, assessed using Sections II and III and a 695MW project, assessed using Section II.

 Canada, Wuskwatim and Keeyask (pdf 130kb)

China, Shuibuya

1,840MW project, assessed using Section IV of the draft Hydropower Sustainability Assessment Protocol (August 2009)

 China, Shuibuya (pdf 304kb)

Colombia, Sogamoso

820MW project, assessed using Section III of the draft Hydropower Sustainability Assessment Protocol (August 2009)

 Colombia, Sogamoso (pdf 8.2kb)

Germany, Waldeck I

70MW project, assessed using Section III of the draft Hydropower Sustainability Assessment Protocol (August 2009)

 Germany, Waldeck I (pdf 229kb)

Iceland, Karahnukar

690MW project, assessed using Sections II (partial), III and IV of the draft Hydropower Sustainability Assessment Protocol (August 2009)

 Iceland, Karahnukar (pdf 43kb)

India, Teesta V

510MW project, assessed using Section IV of the draft Hydropower Sustainability Assessment Protocol (August 2009)

 India, Teesta V (pdf 282kb)

Lao PDR/Cambodia/Thailand/Vietnam, 3S Basin

Project assessed using Section I of the draft Hydropower Sustainability Assessment Protocol (August 2009)

 Lao PDR/Cambodia/Thailand/Vietnam, 3S Basin (pdf 39kb)

South Africa, Ingula

1,332MW project, assessed using Section III of the draft Hydropower Sustainability Assessment Protocol (August 2009)

 South Africa, Ingula (pdf 210kb)

South Africa, Palmiet and Drakensberg

This document shows the result of two trials using the draft Hydropower Sustainability Assessment Protocol (August 2009): a 200MW project, assessed Section IV and a 250MW project, also assessed using Section IV.

 South Africa, Palmiet and Drakensberg (pdf 111kb)